5

On June 27 at approximately 10:15 a.m., the arm of the excavator struck at least six locations on the north and south support tower and lift span. Right away, the Port of Hood River closed the bridge and engineers completed a constructability review.

Chelsea Marr / file photo

By Kevin Greenwood

Port of Hood River