The week of July 28, 2025, City crews and contractors will apply fog seal to all streets that received chip seal treatment last month. These fog seal projects will require short duration road closures between 7:00 a.m. and 5:00 p.m. at each location. Detours will be in place during work hours.
Work scheduled July 28 through 31, 2025:
STREET
BEGIN
END
Columbia Rd.
River Rd.
End of Pavement
Cascade St. W.
W. 8th St.
(North intersection)
W. 8th St.
(South intersection)
Hostetler St
W. 6th St.
W. 8th St.
Heritage Loop
Heritage Way
(West intersection)
Heritage Way
(East intersection)
W 2th St.
Webber St. Eastbound Lane
Freeway Onramp
W 10th St
Cherry Hts. Rd.
Union St.
W 6th St.
Cherry Hts. Rd.
Chenowith St.
W 2nd St.
190’ W of Cherry Hts. Rd.
Lincoln St.
W 8th St.
Bridge St.
Garrison St.
Lincoln St.
W 5th Pl.
W 7th St.
W 6th St.
Lincoln St.
End of Pavement
W 15th St.
Trevitt St.
Garrison St.
W 21st St.
Mt. Hood St.
Bridge St.
Grant Circle
W Scenic Dr.
End of Pavement
Laughlin St.
E 2nd St.
E 3rd St.
Jefferson St.
E 14th St.
E Scenic Dr.
Monroe St.
E 2nd St.
End of Pavement
Dry Hollow Rd.
E.16th Pl.
E 19th St.
J Street
E 12th St.
E 13th St
E 9th St.
Lewis St.
Brewery Grade
This road work is expected to extend the service life of the pavement structure
Please proceed with caution in these areas during construction times and observe all temporary traffic control devices. Thank you for your assistance during this work.
If you have questions, please contact the Public Works Department at (541) 296-5401.
Recordatorio-Continúan los proyectos de preservación del pavimento
La semana del 28 de julio 2025, las cuadrillas y los contratistas de la Ciudad aplicaran el sello antiniebla a todas las calles que recibieron tratamiento con sello de viruta el mes pasado. Estos proyectos de sellos antiniebla requerirán cierres de carreteras de corta duración entre las 7:00 a. m. y las 5:00 p. m. en cada lugar. Los desvÃos estarán durante las horas de trabajo.
Trabajos programados del 28 al 31 de julio 2025:
CALLE
EMPEZA
TERMINA
Columbia Rd.
River Rd.
Fin del pavimento
Cascade St. W.
W. 8th St.
(intersección norte)
W. 8th St.
(intersección sur)
Hostetler St
W. 6th St.
W. 8th St.
Heritage Loop
Heritage Way
(intersección oeste)
Heritage Way
(intersección este)
W 2th St.
Webber St. carril en dirección este
Rampa de entrada a la autopista
W 10th St
Cherry Hts. Rd.
Union St.
W 6th St.
Cherry Hts. Rd.
Chenowith St.
W 2nd St.
190’ al oeste de Cherry Hts. Rd.
Lincoln St.
W 8th St.
Bridge St.
Garrison St.
Lincoln St.
W 5th Pl.
W 7th St.
W 6th St.
Lincoln St.
Fin del pavimento
W 15th St.
Trevitt St.
Garrison St.
W 21st St.
Mt. Hood St.
Bridge St.
Grant Circle
W Scenic Dr.
Fin del pavimento
Laughlin St.
E 2nd St.
E 3rd St.
Jefferson St.
E 14th St.
E Scenic Dr.
Monroe St.
E 2nd St.
Fin del pavimento
Dry Hollow Rd.
E.16th Pl.
E 19th St.
J Street
E 12th St.
E 13th St
E 9th St.
Lewis St.
Brewery Grade
Se espera que este trabajo vial prolongue la vida de la estructura del pavimento.
Proceda con precaución en estas áreas durante los tiempos de construcción y observe todos los dispositivos de control de tráfico temporales. Gracias por su ayuda durante este trabajo.