HR Bridge toll pricing changes start next month

Hood River Bridge raised.

That Hood River Bridge’s lift span appears to be in good condition following a routine mechanical and electrical inspection on Tuesday by engineers contracted by the Port of Hood River.

Michael McElwee, the port’s executive director, said the 246-foot-long lift span “checked out pretty well” during the inspection, which included one full lift and two partial lifts of the span. The cables and the machinery used to lift the bridge deck were replaced in 2000, according to McElwee, and seem to be holding up well.