A1 odot work on i-84.JPG

Exit 63, shown, and Exit 64, on Interstate 84 in Hood River will be under construction starting March 2. This is the view from Second Street looking east toward exit 64.

Repairs begin March 2 to the aging bridges that carry Interstate 84 across Hood River. That will mean around-the-clock single lane closures in both directions and ramp closures.

The concrete decks are deteriorating on the I-84 structures over Hood River between exits 63 and 64. The repairs will increase their lifespans and safety. Work will take place in phases to minimize impacts during the peak summer travel season.