At 3 p.m. on Wednesday, Dec. 13, the City of Bingen celebrated the remodeled playground at Daubenspeck park with a ribbon-cutting ceremony.

The park’s transformation includes a new play structure for small children, a merry-go-round and new swings that include an accessible swing, a parent/baby swing and a disk swing. For the larger play structure, outdated or nonfunctional components have been replaced. Additionally, four new picnic tables and six benches have been added.