White Salmon Valley School District’s (WSVSD) Bruin Stadium project is in its design phase, with construction expected to begin next year, in time for a fall opening.
White Salmon Valley School District’s (WSVSD) Bruin Stadium project is in its design phase, with construction expected to begin next year, in time for a fall opening.
WHITE SALMON — Superintendent Rich Polkinghorn had another design update for board members at White Salmon Valley School District’s (WSVSD) Nov. 18 meeting.
“We’ve welcomed Lucas Padgett, a 10th grader at Columbia High School, to our design team,” he said. “Lucas is interested in becoming an architect and has started joining us for design meetings … He gets to see how a project like this comes together, and we get to hear his perspective as we design spaces students will use every day.”
The design team met earlier that day to review playground equipment. There will be two playgrounds — one for kindergarteners, and another for older students.
“The design includes accessible play equipment and a soft, cushioned surface so students of all abilities can use the playgrounds,” Polkinghorn said. “We also talked through fence lines and even where to put the outdoor faucets.”
Cost estimates have put the elementary school project at about 10% above the maximum allowable construction cost (MACC), or budget cap set by the district, with the stadium project at MACC. Both include a contingency.
“The architect and CSG (Construction Services Group) both said the estimates are where they’d expect them to be at this stage of design,” he said.
Next for the design team is value engineering — or project review — to look for cost reductions that will also keep the overall design intact.
“After that, we’ll identify bid alternates, which are items we can choose to include (or exclude) depending on where the contractors’ bids come in,” he explained. “Then the design team will develop the construction drawings, and we’ll assemble the bid documents and put the projects out to bid. Once we see the bids, we’ll know which alternates we can include within the budget or which will need to be removed from design.”
Planning ahead
Polkinghorn said the district is already thinking about how schools will operate during the transition.
Grades 7-12 Assistant Principal Jim Donnelly, Whitson Elementary Principal Todd McCauley, and Polkinghorn met with art, music and PE teachers from all four schools early last week to identify what is working, what staff hopes to build on, and what scheduling could look like.
“We heard about the importance of consistent time for PE, dedicated space for music, and schedules that give students access to electives,” he said. “We’ll meet with the group again in about a month to use their input to develop more concrete plans for next year and beyond.”
•••
The WSVSD board generally meets the fourth Thursday of the month, but because of the Thanksgiving holiday, the November meeting was moved up a week.
Commented
Sorry, there are no recent results for popular commented articles.