Bridge on Eagle Creek Trail replaced

A NEW BRIDGE was delivered in late February to Tish Creek on Eagle Creek Trail. The 41-foot truss structure replaces an older bridge that was wiped out by a storm. A truck, pictured at right, towed the bridge to an area near the site, and a helicopter flew it the rest of the way.

Crews installed a new 41-foot truss bridge at Tish Creek, along Eagle Creek Trail, on Feb. 28. A helicopter flew the old bridge away from the site and delivered a new one in its place.

The former bridge was destroyed by a winter storm. Eagle Creek Trail was closed until last weekend, when a contractor with the U.S. Forest Service secured the replaced bridge.