HR Bridge tolls go up Feb. 1

Hood River-White Salmon Interstate Bridge

Port of Hood River announces intermittent closures of both lanes of the Hood River/White Salmon Interstate Bridge Wednesday, Aug. 10 through Friday, Aug. 12 between the hours of 9 a.m. and 3 p.m. Port crews and bridge engineers will be conducting live testing of the bridge’s lift span. Each closure is expected to last up to 20 minutes. For more information, call the Port of Hood River at 541- 386-1645 or email porthr@gorge.net.