32

The Port of Hood River is looking to build a new terminal building at the Ken Jernstedt Airfield, as seen in this rendering. 

HOOD RIVER — If plans and funding come together, pilots landing at the Port of Hood River’s Ken Jernstedt Airfield will find a brand-new terminal building by 2028 at the earliest, as described in a port commission meeting Dec. 16.

Jernstedt Field, located adjacent to Western Antique Aeroplane and Automobile Museum (WAAAM) on Tucker Road, struggles financially, losing $250,000 in FY 2021, for instance. But the port is reducing fiscal support as it transfers bridge toll revenues to the bridge replacement effort, and is aiming for a self-sustaining airfield by FY 2027. An additional 10 hangar spaces set for construction in 2026 will bring in $60,000 annually, and combined with anticipated airfield land leases, the port anticipates fiscal break-even and even a set-aside for capital projects — like the terminal building.

Port of HR

The Port of Hood River is looking to build a new terminal building at the Ken Jernstedt Airfield. Above, the first-floor rendering. 

Port of HR

The Port of Hood River is looking to build a new terminal building at the Ken Jernstedt Airfield. Above, the second-floor rendering.