PORTLAND (AP) — For the second time in two weeks, the Bonneville Power Administration (BPA) energized and brought into service a new 500-kilovolt transmission line, this time connecting central Washington and Oregon.

The 28-mile, single-circuit line connects BPA’s Big Eddy Substation in The Dalles to the new Knight Substation northwest of Goldendale, Wash.