A traffic signal installation project on State Route 14 on the Washington side of the Hood River Bridge began construction on Monday, Sept. 20.

The project will install a new, three-way traffic signal at the intersection, which will allow traffic enough time to make turns onto SR 14 without waiting for cross traffic to pass.